Technical discussion for CERN/MIT pixel R&D

America/New_York
Gian Michele Innocenti (Massachusetts Institute of Technology), Ivan Amos Calì (staff@mit.edu), James Kelsey (staff@mit.edu), Jelena Lalic (Massachusetts Institute of Technology), Patricia Smith (MIT Bates Lab for Nuclear Science)
Description

Technical discussions for the ITS3/SVT detector R&D.

ZOOM link

Dropbox paper for round-table discussion

    • 09:30 09:45
      News 15m
      Speaker: Gian Michele Innocenti (Massachusetts Institute of Technology)
    • 09:45 10:00
      Report on mechanics 15m
      Speakers: James Kelsey (staff@mit.edu), Patricia Smith (MIT Bates Lab for Nuclear Science)
    • 10:00 10:10
      Report on CMOS AI framework 10m
      Speaker: Jelena Lalic (Massachusetts Institute of Technology)

      SBB tile design and integration: 

      • MR !486: This merge request focuses on the finalization of design, characterization and model extraction of the sbb_tile, as well as adapting uvm tests 
      • MR !631  This MR adapts periphery and sbb_tile_wrapper instance for the new sbb_tile and adapts the implementation flow.

            Above MRs to be merged today, and follow up in: 

      • libery characterization:  #809
      • timing closure: #828

      Estimates: #809 to be closed by the end of Thursday 11/07,  #828  - more detailed stufy done by the end of the week 12/07, and not urgent sub-issued to be followed-later. 

      With closing these 2 issues, sbb_tile will be fully integrated leaving several other followup issue for QoR imporvement. 

      SBB tile integration inside the periphery:

      Notes:

      Work in !486 done on 6M2Y, (re)porting of MOSAIX_sbb_bridges/sbb_tile to 7ML1F be done today by Corentin

      Periphery implementation flow:

      • power domain configuration (pd_gd) for sbb_tile and added isolation cells !388 (merged)
      • added report lint !551 (merged)
      • power strips out of pitch to the pixel matrix !594 (merged)
      • adding power pin on periphery for new conf bit !537 (merged)
      • timing reports differ significantly from design_finishing and export (design_finishing.sta) !584 (WIP) 

        Note: Other issues for periphery implementation: 
          • Several other open issues for the periphery flow, not critical. This work to start after solving timing and lib issues for sbb_tile
            • followpin wires missing #730
            • #492, GDomain nets rebuffered in the LDomain #491, metall fill verification #446
            • enable non default rules #447
    • 10:10 10:25
      Update on sensor design 15m
      Speaker: Jelena Lalic (Massachusetts Institute of Technology)
    • 10:25 10:40
      Report on readout and testing 15m
      Speakers: Ivan Amos Calì (staff@mit.edu), Jelena Lalic (Massachusetts Institute of Technology)