Weekly SubMIT project team meeting

→ America/New_York
ZOOM

ZOOM

David Walter (Massachusetts Institute of Technology), Mariarosaria D'Alfonso (Massachusetts Institute of Technology)
    • 10:00 → 10:20
      Discussion 20m
      Speakers: David Walter (Massachusetts Institute of Technology), Luca Lavezzo (MIT), Mariarosaria D'Alfonso (Massachusetts Institute of Technology), Matthew Heine (Massachusetts Institute of Technology)

      Paul:

      • Moira groups: https://cleo.mit.edu/issues/6322 and https://cleo.mit.edu/issues/6339
      • new DNS request  https://cleo.mit.edu/issues/6336

       

      certificates roots depth (David):

             requested and update now with alias so that goes over submit

             TO DO: update the document for next time and Paul need to update the DNS

      Hardware failure (David): 

      • submit75.cern.ch: needed to reboot
      • ceph : one disk failed, restarted

       

      Linux PHP vulnerability, needed update

      Dima requested submit80 for IO test:

      • long time to drain it, i.e. done on Friday only on Sunday was free; a long queue of slurm jobs piled up

       

      New nodes from T3: 

      already in use see the ganglia report from the 1st week attached in the indico agenda 

      Maria added to dashboard http://submit08.mit.edu/~mariadlf/SUBMIT/submitnodes-dashboard.html

      mainly those in green are worth:

        1. other nodes are alive but not connect on slurs and run old Tier3 stuff, slums ...
        2. those in brown are old centos7 can be removed.

       

      Possible future re-organization:

        1.         take the extra 1080 GPU ( extra 10ish are around) and put together with submit60 to 73. Since no enough power on the submit racks,  can possibly 95,96 since are old and 1gb can go in the Tier3 room
        2.         include disks 1TB vs 6TB as storage, maybe for some backup (i.e. old users)
        3. more servers from Tier2 will be available O(40), they are supposed to be newer