He3-ABS: Monthly Meeting

→ America/New_York
Zoom

Zoom

Prajwal Mohan Murthy (MIT LNS)
Description

Monthly meeting of MIT-BNL He3-ABS Collaboration

Mail-list

Meeting Minutes

Helium-3 Polarimetry Meeting
Date: November 19, 2026
Time: 10:00 - 10:30 AM
Location: Virtual (Zoom)

Attendees

Prajwal Mohan Murthy, Haixin Huang, Deepak Raparia, Vera, Bob.


1. JINST Conceptual Design Report Review

The attendees discussed external comments and proposed revisions to the conceptual design report intended for submission to the Journal of Instrumentation (JINST).

Three major comments were considered:

1. Manuscript Length and Scope

The current manuscript is approximately 80 pages long, raising concerns about its length and scope. The possibility of reducing the manuscript by separating some of the more detailed accelerator-related studies into a subsequent publication was discussed.

In particular, the beam depolarization and beam loss sections could be developed into a separate article for Physical Review Accelerators and Beams (PRAB).

2. Conductance Calculation

A potential factor-of-four error was identified in the conductance formula used in the manuscript. The concern arises from the assumption that atoms enter at the center of the tube, rather than following the entrance distribution assumed in the existing calculation.

The conductance expression and its underlying assumptions require further verification.

3. Veto Detector Inefficiency

The reported 3.7% inefficiency of the veto detector was discussed. Zhengqiao should be consulted to clarify the origin and validity of this estimate.


2. EIC Accelerator Complex Updates

The attendees reviewed recent modifications to the EIC accelerator complex communicated by Sergey N.

These include the proposed 41 GeV bypass and changes to the second detector region. The corresponding accelerator layout and descriptions in the manuscript will need to be updated to reflect these developments.

Revisions to the accelerator complex figure were also discussed, including an explicit caption statement clarifying that the Tandem accelerators are not part of the EIC.

Additional clarification is required regarding the locations of the Siberian snakes in the accelerator complex. Kiel will be consulted to verify their placement.


3. Meeting End

The meeting was ended prematurely due to unauthorized access to the Zoom meeting link.


4. Action Items

  1. Figure caption: Explicitly clarify that the Tandem accelerators are not part of the EIC.

  2. Siberian snakes: Consult Kiel regarding their locations in the accelerator complex.

There are minutes attached to this event. Show them.