-
Katerine Pachal10/07/2024, 09:00
-
Stephanie Radel (TRIUMF)10/07/2024, 09:10
-
Ross Corliss (Massachusetts Institute of Technology)10/07/2024, 09:40
-
10/07/2024, 10:30
-
Aveen Mahon10/07/2024, 10:45
Beam optics simulation and document
Go to contribution page
PMQ order?
Drawings?
Collimator status? -
Ethan Cline, Ethan Cline10/07/2024, 11:15
Shape, amount, FLUKA results
Go to contribution page -
Katerine Pachal10/07/2024, 11:45
-
Gabby Gelinas (UBC/TRIUMF)10/07/2024, 13:00
-
Jan Bernauer (Stony Brook University)10/07/2024, 13:30
-
Konstantin Olchanski (TRIUMF)10/07/2024, 14:00
-
10/07/2024, 14:30
-
Laura Miller10/07/2024, 14:45
-
Win Lin (Stony Brook University)10/07/2024, 15:15
-
Bishoy Dongwi10/07/2024, 15:45
-
10/07/2024, 16:15
-
10/07/2024, 18:00
This is the pub that replaced Biercraft in Wesbrook Village. We can easily walk there in around 20 minutes; the reservation is for 6 pm.
Go to contribution page -
Ernest Ihloff (Massachusetts Institute of Technology), James Kelsey (staff@mit.edu)11/07/2024, 09:00
-
Ryan Richards (Hampton University)11/07/2024, 09:30
-
Douglas Hasell (Massachusetts Institute of Technology), Katerine Pachal11/07/2024, 10:00
-
11/07/2024, 10:40
-
Jan Bernauer (Stony Brook University), Mike Hasinoff (The University of British Columbia)11/07/2024, 11:00
Grant renewals for Canada, SBU
Go to contribution page -
Everyone11/07/2024, 11:30
-
Oliver Kester (TRIUMF)11/07/2024, 13:00
-
Thomas Planche (TRIUMF)11/07/2024, 14:00
-
Ethan Cline (Massachusetts Institute of Technology)11/07/2024, 14:30
What should we do for 17 MeV? What can we do beyond that? How do we sell it if/when a competitor gets there first?
Go to contribution page -
11/07/2024, 15:00
-
Everyone11/07/2024, 15:15
What do we need that we don't have? How can we get it?
Go to contribution page -
11/07/2024, 15:45
-
11/07/2024, 16:05
-
11/07/2024, 19:00
Reservation made for 20 people at the Broadway location
Go to contribution page
Menu: https://www.eastiseast.ca/menu -
Stephanie Radel (TRIUMF)12/07/2024, 09:00
-
Doug Preddy (TRIUMF)12/07/2024, 09:25
Power supplies, cable running, electronics hut, collimator, etc.
Any concerns with shipping?
Go to contribution page -
Douglas Hasell (Massachusetts Institute of Technology)12/07/2024, 09:45
Update given timeline news and status of plans? One versus two phase? Available personnel from MIT etc? Does the personnel availability change with the timeline?
Go to contribution page -
12/07/2024, 10:15
-
Douglas Hasell (Massachusetts Institute of Technology)12/07/2024, 10:30
-
Ethan Cline (Massachusetts Institute of Technology)12/07/2024, 11:00
Moller and Bhabha scattering: what beam would we need? What would the impact be of having a smaller range of energies?
Go to contribution page -
12/07/2024, 11:40
-
Need to understand what must happen for these to operate in parallel. Missing components.
Go to contribution page -
Everyone
Is there a possibility for a one-spectrometer first phase? If not, is there anything of physics value we could do with just detectors and no spectrometers?
Go to contribution page -
Both external-facing safety documents and collaboration agreements
Go to contribution page -
Katerine Pachal
Choose timezone
Your profile timezone: